Netgear GS724T User Manual Page 18

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 17
4-13
v1.0, January 2011
Chapter 4
Installation
This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch
installation involves the following steps:
Step 1: Preparing the Site
Step 2: Installing the Switch
Step 3: Checking the Installation
Step 4: Connecting Devices to the Switch
Step 5: Installing an SFP GBIC Module
Step 6: Applying AC Power
Step 7: Managing the Switch using a Web Browser or the PC Utility
Step 1: Preparing the Site
Before you installing the switch, ensure the operating environment meets the operating
environment requirements in the following table.
Table 4-1. Site Requirements
Characteristics Requirements
Mounting Desktop installations - Provide a flat table or shelf surface.
Rack-mount installations - Use a 17-inch (48.3-centimeter) EIA standard equipment
rack that is grounded and physically secure. The rack-mount kit supplied with the switch
is also required.
Access Locate the switch in a position that allows access to the front panel RJ-45 ports, view the
front panel LEDs, and access power connector.
Page view 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 31 32

Comments to this Manuals

No comments