Netgear ReadyNAS 3200 Manual Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
ReadyNAS 3200 Hardware Manual
1-8 Getting Started
v1.1, July 2009
Preparing for Setup
Read these instructions in their entirety before you begin. Locate the ReadyNAS 3200 shipping
carton, remove the rack mounting kit and prepare to work with it.
Installing the System into a Rack
Follow these instructions for installing the system into a rack.
1. The rack mounting kit contains two rail assemblies. Each assembly consists of two sections:
an inner fixed chassis rail that secures directly to the ReadyNAS 3200 chassis and an outer
fixed rack rail that secures directly to the rack itself. Extend the rail assembly by pulling it
outward. Press the release tab and separate the inner rail from the outer assembly.
2. Use the provided mounting screws to mount the inner rails to the system chassis.
Figure 1-6
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 39 40

Comments to this Manuals

No comments